176 Lockwood
Owner
The College of Charleston
Contract Amount
$1,870,453
Completion Date
May 2025
This project involved the complete removal and replacement of the existing curtainwall and storefront windows and doors, including revisions to CFS studs to accommodate new systems and meet current wind load requirements, as well as replacement of corroded tracks and studs. The EIFS system, which showed significant deterioration and exposed mesh, was evaluated with the manufacturer and engineer of record, leading to selective demolition and replacement of damaged areas. Following these repairs, Sto Elastomeric Coating was applied across all building surfaces, and all existing sealants were replaced with newly prepared joints and sealants to ensure long-term performance and proper cladding functionality.